New House | ||||||||
|
||||||||
Page: 1 2 3 4 |
||||||||
work to do b4 move-in 1. demo kitchen
2. paint bedroom 3. refloor house --- early movein possible at this point --- 4. central air 5. plumbing. going to do hot water, move around laundry, and fix some stupid problems. actually plumbing in good shape also will put in flood pans under washer and water heater. 6. a/o 4 tons estimated. we have now removed the oven which was 40 amps on a 50 amp / 240 breaker, so we have plenty of power. now need the AC man to get us quote! will use inside 12000 btu hall a/c if need be. --- now full move in will go ahead. |
||||||||
[ Prev ] [ Next ] |