New House
double-oven1.JPG
double-oven1.JPG
double-oven2.JPG
double-oven2.JPG
P1010017.JPG
P1010017.JPG

shirley-at-work
still sane after writing $44,000 check!
far-view1.JPG
far-view1.JPG

you can see the house below the
twin palms.  this view is from
current trailer, about 200 feet
to new house.
side-view.JPG
side-view.JPG
back-hall-laundry.JPG
back-hall-laundry.JPG
back-bedroom.JPG
back-bedroom.JPG

looks worse in person than in this photo.
ceiling matches the wall color.  Currently
called the Mars room, all we need is sand and rovers
common-bath.JPG
common-bath.JPG

Page:   1  2  3  4 
work to do b4 move-in
1. demo kitchen
2. paint bedroom
3. refloor house
--- early movein possible at this point ---
4. central air
5. plumbing.  going to do hot water, move around laundry,
and fix some stupid problems.  actually plumbing in good shape
also will put in flood pans under washer and water heater.
6. a/o  4 tons estimated.  we have now removed the oven which
was 40 amps on a 50 amp / 240 breaker, so we have plenty
of power.  now need the AC man to get us quote!  will use
inside 12000 btu hall a/c if need be.
---
now full move in will go ahead.